Spring Field Review Site 11 2017GuilfordGreensboro Bridge on Taxiway over I-73 between I-840 and NC-68

The 4 span Piedmont Triad International Airport taxiway bridge crosses I-73 at a 130 degree skew and has a length of 380 feet and a width of 365 feet. Due to the geometry constraints of the site, spans are staggered and girders are oriented perpendicular to the skewed bents.

Was this page helpful?